NEELAXI
IoTIndustry: Smart Manufacturing

Industrial IoT Telemetry & Predictive Maintenance

Real-time edge sensor ingestion pipeline and anomaly detection for manufacturing facilities.

Industrial IoT Telemetry & Predictive Maintenance
Case Study Overview

System Context & Operational Scope

An end-to-end telemetry system capturing vibration, temperature, and acoustic metrics across factory machinery to predict mechanical failures before downtime occurs.

The Engineering Challenge

Unplanned manufacturing machine stoppages were costing production facilities thousands of dollars per hour. Existing supervisory control systems lacked predictive foresight.

Core Engineering Objectives

  • Ingest 50,000+ sensor data points per second with sub-50ms latency.
  • Detect early micro-vibration deviations indicative of bearing wear.
  • Deliver an intuitive real-time operations dashboard for floor managers.

Verified Performance Metrics

50k/sec
Ingestion Throughput
62%
Downtime Cut
< 45ms
Sensor Latency

Technologies Used

GoC++MQTTApache KafkaTimescaleDBReactTailwind CSSGrafana
ENGINEERING APPROACH

Architectural Strategy

Engineered a low-footprint C++ firmware client for edge gateways reading industrial Modbus/CAN bus registers, communicating via MQTT over TLS to a resilient Go ingestion cluster backed by Apache Kafka.

DEPLOYED SOLUTION

Implementation Details

A distributed streaming architecture feeding TimescaleDB for time-series aggregation and an unsupervised anomaly detection model triggering automated maintenance alerts.

Capabilities

Key Architecture Features

Specific technical capabilities built into this platform to ensure reliability and performance.

High-throughput MQTT broker cluster handling 50k+ events/sec

Dynamic thresholding and FFT spectral analysis at the edge

Interactive SVG floorplan visualization with live equipment status

Automated SMS/Email incident dispatch and technician ticketing

Historical degradation trend analysis and remaining useful life (RUL) estimation

MEASURABLE OUTCOME

Eliminated 62% of unplanned machinery downtime across 4 pilot production facilities within the first 6 months of operation.

Build a Similar Solution

Have a Technical Project in Mind?

Discuss your requirements with our architects. We will provide practical guidance on tech stacks, timelines, and implementation feasibility.